Existing and Revised Tariff for the Year 2010-11
Sr. No.
Category of consumers
Existing Tariff
Revised Tariff approved by the Commission
Energy Rate (paise/kwh)
MMC (Rs/kw or part thereof)
Energy Rate (paise/kwh)
MMC(Rs)
A)
PERMANENT SUPPLY
1
Domestic
a)
Upto 100 units
282
35
311
Loads upto 100 KW Rs.38/KW, loads exceeding 100 KW Rs.34/KVA
b)
101 to 300 units
428
452
c)
Above 300 units
452
478
2
Non-Residential
491
126
519
Loads upto 100 KW Rs.136/KW, loads exceeding 100 KW Rs.122/KVA
3
Public lighting
482
As per 8 hrs / Day
510
As per 8 hrs / Day
4
Agricultural Pumpsets
i) Without Govt. subsidy 285 Ps / kwh or Rs.283/ BHP / Month
NA
i) Without Govt. subsidy 320 Ps / kwh or Rs.273/ BHP / Month
NA
ii) With Govt. subsidy 0
ii) With Govt. subsidy Rs.50/ BHP / Month or 59 Ps / unit
5
Industrial
a)
Small power
392
104
414
112/KW
b)
Medium
433
138
458
148KW
c)
Large
i)
General industry
433
124 /KVA
458
133 /KVA
ii)
PIU
433
326 /KVA
458
351/KVA
iii)
Arc Furnace
433
326 /KVA
458
351 /KVA
6
Bulk Supply (including MES)
HT
436
204 /KVA
461
219/KVA
LT
463
204 /KW
489
7
Railway Traction
512
208 /KVA
541
224/KVA
B) SEASONAL INDUSTRY : COTTON GINNING, PRESSING AND BAILING PLANT, RICE SHELLERS / HULLER MILLS, RICE BRAN STABILIZATION UNITS (WITHOUT T.G. SETS) (SP, MS, LS)
a)
During Season (From 1st Sept to 31st May next year)
SP
392
381
414
410/KW
MS
433
381
458
410/KW
LS
433
343 /KVA
458
369 /KVA
b)
Off season
SP
464
NA
491
NA
MS
497
NA
525
NA
LS
497
NA
525
NA
C) ICE FACTORY & ICE CANDIES AND COLD STORAGE
a)
Season (April to July)
SP
392
519
414
558/KW
MS
433
519
458
558/KW
LS
433
468 /KVA
458
503/KVA
b)
Off Season
SP
392
104
414
112/KW
MS
433
104
458
112/KW
LS
433
93 /KVA
458
100/KVA
D) GOLDEN TEMPLE, AMRITSAR AND DURGIANA TEMPLE, AMRITSAR
a)
First 2000 units
Free
N.A.
Free
N.A.
b)
Beyond 2000 units
349
N.A.
369
N.A.
E) TEMPORARY SUPPLY
i)
Domestic
771
Rs.640 or Rs.127/KW whichever is higher
815
Rs.689 or Rs.137/KW whichever is higher
ii)
NRS
771
Rs.1281 or Rs.321/KW whichever is higher
815
Rs.1378 or Rs.345/KW whichever is higher
iii)
Industrial (SP,MS & LS)
As per tariff approved at A(5) above for permanent supply + 100%
Rs.513/KW of sanctioned load for SP and MS and Rs. 461/KVA for LS
As per tariff approved at A(5) above for permanent supply + 100%
Rs.552/KW of sanctioned load for SP and MS and Rs. 496/KVA for LS
iv)
Wheat Thresher
-do-
-do-
-do-
-do-
v)
Fairs, exhibition & melas Congregations
Bulk supply tariff as at A(6) + 50%
Rs.5128 per service
Bulk supply tariff as at A(6) + 50%
Rs.5517 per service
vi)
Touring Cinemas
a)
Lights and fans
771
For (a) and (b) Rs. 1281 or Rs. 321/KW of sanctioned load whichever is higher
815
For (a) and (b) Rs. 1378 or Rs. 345/KW of sanctioned load whichever is higher
b)
Motive load
Rate for Industrial permanent supply as at A(5) + 100%
Rate for Industrial permanent supply as at A(5) + 100%
Notes:
i. SC and non SC BPL, Domestic consumers with connected load upto 1000 watts will be given 100 units of free power per month in view of Govt subsidy;
ii) AP consumers and consumers mentioned in (i) above will not be charged service charges and meter rentals in view of Govt subsidy;
iii). All other charges including rentals and deposits which were being collected by the Board as per Schedule of General Charges, Supply Code and General Conditions of Tariff & Schedules of Tariff approved by the Commission, will be continued to be charged by the Successor Entities at the existing rates till these are reviewed by the Commission;
iv) Operating conditions of MMC will continue to be as specified in the relevant Schedule of Tariff;
v) Consumers obtaining one point supply for providing electricity to ultimate users in the Co-operative Group Housing Societies/Residential Colonies/Commercial Complexes/Shopping Malls/Industrial Estates etc. will be eligible for rebate as specified in the Conditions of supply approved by the Commission;
vi. Checking of load of DS consumers will continue to be suspended.